What started as an energy efficiency project to replace phased-out halogen and fluorescent lamps quickly grew into a comprehensive circular-economy strategy. Instead of purchasing brand new LED fittings, Arup investigated whether the existing lighting infrastructure could be kept and remanufactured. Partnering with The Regen Initiative, they conducted detailed surveys to determine which luminaires were suitable for conversion.

The Clients Brief
The primary consultation revolved around the existing office lighting - Zumtobel ML4 1200mm x 300mm, 2 x 28w Fluorescent luminaires and a sensible way to upgrade to LED. After consultation and product evaluation, the practical solution was to try and upgrade the products on site rather than remove for external off site works.

Design
The REGEN Initiative evaluated a sample luminaire offsite, analysing multiple designs to find the most practical approach. After defining the remanufacturing scope, they engineered the LED conversions and produced "golden samples" for approval. This process successfully verified both regulatory compliance and maintained lighting levels

The LED Light Module
The solution featured a single LED light module equipped with a custom gear tray held securely in place by strong neodymium magnets. Tridonic LED boards, frosted diffusers, and matching DALI drivers delivered perfectly homogeneous illumination. Thanks to the magnetic fixing mechanism, the installation was fast and straight forward for CBRE electrical contractors.
Onsite Evaluation
The Goldens samples were installed on site for client evaluation.
Project Overview
The final results were amazing. The resulting strategy considered component obsolescence, maintenance and operations, circularity, embodied carbon, luminaire standardisation and the future repairability of components.
The lighting controls were also reviewed and upgraded, creating an opportunity to consolidate and improve the original lighting design while introducing daylight linking to further reduce operational energy.
Collaboration was fundamental. Arup, Arup Lighting, CBRE, Simmtronic and The Regen Initiative worked together to develop a practical solution that could be delivered within an occupied commercial building.
Rather than removing thousands of fittings and sending them into the electrical waste and recycling stream, luminaires were remanufactured on site and in situ.
Delivered across four phases over two years, sections of individual floors were temporarily closed, minimising disruption to occupants and ongoing project work.
Published project results forecast total annual building savings of 237,000 kWh of energy, £117,000 in energy costs and 45.7 tonnes CO₂e.
The project demonstrates that existing lighting should not automatically be considered obsolete when technology or legislation changes.
Through careful engineering, collaboration and circular thinking, existing assets can become the foundation of a high-performance lighting system—reducing operational energy, avoiding embodied carbon and keeping valuable materials in use for longer.
Project Performance Metrics
- 119,988 kg/CO₂e Avoided
- 69% carbon avoidance in remanufacture
- 2000 Luminaires remanufactured
- 53% Energy Savings across the project
- 237,000 KWh Energy Savings
- In-situ LED retrofit of T5 fluorescent to LED
- On site installation Light levels maintained
- Every retrofit gear tray tested and warranted
- Winner of the Build Back Better Awards : Build Back Better Awards 2026